Building 5977

End of Shift

Customer. Work Sat, Nov 14. Shift 03A 06:00 to 18:30.Change on Today

Workload and outlook

Direct labor hours

  • Piece Picking

    Unknown
    Required hrs
    Unknown
    Remaining hrs
    Unknown
    Available hrs, all shifts
    197.0
  • Full Pallet Picking

    Unknown
    Required hrs
    Unknown
    Remaining hrs
    Unknown
    Available hrs, all shifts
    73.9
  • Loading

    Ahead
    Required hrs
    130.8
    Remaining hrs
    58.3
    Available hrs, all shifts
    82.1
Projected at cutoff
96%
Planned demand changes, from Today
None
Added to the handoff summary

Move communication

Local only

No message has been sent. Moves listed here stay in this browser.

  • LoadingHold plan. Lend 4 to a behind area if needed.
  • Piece PickingUnknown. Confirm missing inputs to size Piece Picking.
  • Full Pallet PickingUnknown. Confirm missing inputs to size Full Pallet Picking.

Handoff draft

Local only

Unsaved roster changes

You have draft edits that are not saved. Save the draft locally before leaving, or discard it.